利雅得 Al Faisaliah 五星级酒店
Material: 304 拉丝 + 镀金 PVD 装饰面板. Timeline: 从下单到交付 35 天.
"按时交付,零缺陷。FENIER 项目团队与我们当地安装商无缝协作。480 套的分阶段交付与 18 个月施工节奏完全匹配。我们已经在为下两个酒店项目下复购订单。"
Project facts
- Volume
- 480 套厨房(18 个集装箱)
- Timeline
- 从下单到交付 35 天
- Material
- 304 拉丝 + 镀金 PVD 装饰面板
About the project
How long did this project take from order to installation?+
Typical order-to-installation is 60–90 days for projects of this size. Production runs 30–35 days after deposit, sea freight 18–25 days to the destination port, and on-site installation 14–21 days including leveling, hardware adjustment, and countertop fitting.
What was the cabinet material and finish specification?+
All cabinets use 304-grade stainless steel carcasses with powder-coated finishes rated for 1,500-hour salt-spray testing. Drawer boxes are 18mm plywood with Blum soft-close runners. Hinges are 110-degree opening Blum clip-mount with lifetime warranty.
Did you handle logistics and customs clearance?+
Yes. We shipped FOB Shenzhen with CIF option available for select markets. We provide full documentation: commercial invoice, packing list, certificate of origin, CE/Carb compliance certificates, and weld inspection reports. Customs clearance support is included for first-time importers.
What warranty and after-sales support is included?+
15-year structural warranty on cabinet bodies, 5-year warranty on hardware, lifetime warranty on Blum hinges and runners. After-sales support includes spare parts kit (5% of order value shipped free), video troubleshooting, and on-call engineering for any installation issues.
Can this project be replicated in my market?+
Yes. Every project we publish is referenceable. Contact us with your market and project size — we will share the full specification, similar past projects in your region, and connect you with the developer or contractor for direct reference.
Have a similar project?
Send us your specs — we will reply with a quote within 24 hours.